Ideal Machinery Deployment

Project Description

A factory in Karachi was operating 550 KVA generator for 12 hours a day which was costing them a lot due to the fuel consumption. Once CPS assessed their power measures and deployed them with 550KVA generator equipped with Electronic Control Module optimizing the fuel efficiency of the generator. CPS reduced 30% of their fuel cost, gaining a satisfied client.